EC: We have those conditions as surround construction of
cabinets by Federal Furniture Factories for General Electric
and Westinghouse. These conditions, as we find are proving
somewhat troublesome to the mind and activities of [
257].
There has not been the full cooperation, as there should
have been, on the part of the superintendent of construction
in the matter. This condition, however, may be made
satisfactory by the adherence of those conditions and
instructions and suggestions as have been given to the body
of [
257] concerning the associations of the body with
General Electric and with Westinghouse. These should be
made DELIVERABLE, and other business should be obtained and
gotten through and from these same associations and
connections. While some of the conditions that have been
given respecting changes in radio manufacturing after August
enter into these conditions, the change will be in the
numbers and in the character of cabinets that will be
necessary for changes in reception, as of sets that will be
builded by engineers on building and experimenting on such
elements. As to the conditions surrounding this, make them
amenable.
(Q) Will this connection between these two concerns and
Federal Furniture Factories continue, with [
257] handling
the business satisfactorily?
(A) Handling the business satisfactorily, YES. Continue
and continue to grow.
We are through.
BACKGROUND
6/09/28 He obtained Business Reading
257-27.
6/18/28 He submitted further questions.
REPORTS
6/25/28 He requested Ck. Physical
325-20 for his mother.
7/13/28 He referred
4490-1.
8/04/28 He was present for Business Rdg.
257-29.



Edgar Cayce Readings © 1971, 1993, 1994, 1995 by the Edgar Cayce Foundation