(Q) Please advise depth below derrick floor level at which
we should begin coring?
(A) Test the sands at 3,838, as indicated. Then expect the
larger production at those areas indicated, - 4,079 to 82; a
cap or block sand with a black cap, see? In THIS sand, in
and below this, may be expected the production, - eighty feet
or more in this sand.
(Q) The volume - ?
(A) (Interrupting) As indicated, better than a thousand
barrels per day.
(Q) Any further warning or advice?
(A) These beginnings are very satisfactory. Keep the
attitudes, and keep those conditions surrounding same in much
the attitude that exists.
We are through for the present.
Copy to Mr. [2091] - Air Mail, to P.O. Box ..., Big Sandy,
Texas
Copy to Ass'n file
BACKGROUND
See
1561-10.
REPORTS
5/09/40 See
294-197, Par. 17-A advising EC to accept Mr.
[
2091], Mrs. [
2174] and Dr. [
2246]'s invitation to visit
them on the site of the well.
5/15/40 See
1561-13.



Edgar Cayce Readings © 1971, 1993, 1994, 1995 by the Edgar Cayce Foundation