EC: Yes, we have the well here. We have had this before,
you see. In the various depths as have been given, we
find there the indications of that as was given for the
production. In the depth as has been reached at the present
time - 4627 - we still find the indications as have been
outlined for the production. In this present we find we
are in that formation which over-lies the container of live
producing oil, and that the depth through this lime shell, as
is now showing, and which at the present time is some softer
than that just above, through this lime shell, which will be
some 28 feet, we will encounter then the darker gray lime,
changing to that of the cap above the production, which will
be reached through this, going then some 12 - 14 feet. This,
then, should bring the gases, the production, the overflow,
for the production is here. We find the shift as was given
has found the indications and those will produce. Not
necessary for other casing before production is reached.
There may be some troubles from slide in the soft production,
or the drilling at present. This will not be troublesome
very long. Only need watch the line in the sandline near the
run, or band around which this winds, the run is at present
being made with same. Belt will need be spliced, yet
not necessary for a new one to finish these operations.
Keep well to this, for this will prove the successful
operations, only carried out as is given here.
(Q) The report from the well is the depth of 4655. What
will be the total depth to production?
(A) The added depth of 32 - 14, though the depth drilled is
not 4655 at present, you see.
(Q) What is the present depth of the well?
(A) To the bottom of the hole drilled - 4627. The casing
over the production will only be very heavy of the gum
and the sediment of oil. This will give the trouble, as
given, of choking in the first flow, but will give the
added pressure. The total depth from the top to the
production as of live oil will be 4692.
(Q) What precautions will be necessary to control the flow
of oil and gas when it is started?
(A) Only be ready to take care of the first choking, after
this has started, then beware of fire and of the overflow.
Take care of production, with the head as necessary in such
cases. This will come. Only follow the instructions. There
will be sufficient of the monies necessary to complete the
operation. Then 1500 for one over put in.
(Q) What will be the maximum production of the well?
(A) Beginning with 3000 to 3500, increasing after the first
flow of 4000, to 4400, 4500, 4600, 4700 per twenty-four
hours.
(Q) Would it be best that M. B. Wyrick be present when the
well is brought in?
(A) No won't be there when it's brought in. Will be there
soon after. Twenty-nine - thirty -
(Q) Is that of March?
(A) Of March.
(Q) Is that the date when Mr. Wyrick will be there?
(A) When the well will come in. We will have a well here.
It will be large production, a new field, a change. High
grade oil. Much of it [will] have the appearance of the
graded or heated oil. Keep, keep, drilling.
We are through for the present.
REPORTS
2/31/25 Wire:
1925 MAR 31 PM 4 14 (13?)
CA202 DH
CHICAGO ILL 31
EDGAR CAYCE
322 GRAFTON AVE DAYTON OHIO
WE HAVE PASSED FORTY EIGHT HUNDRED FEET FORMATION LOOKS GOOD
SEE WHAT YOU CAN GET FOR US MAIL ME HERE
M B WYRICK
3/31/25 See
4905-19.
fc

7b
b
44
79
Edgar Cayce Readings © 1971, 1993, 1994, 1995 by the Edgar Cayce Foundation
18
0